The external works at TSB Romsey required a crane and road closure. This was a challenging project as the bank was located on a road and required a number of licenses to close part of the road for the crane.
Dartmouth General Contractors recently completed the new fit out for Carter Jonas of their Malborough site and it was a triumph. The Client was delighted with the works completed by Dartmouth General Contractors and Simon Turl from Carter Jonas stated: “Positive attitude and a willingness to work together to resolve any problems that arose means […]
This refurbishment was completed in the Camberley funeral care branch for Southern Co-op, our Project Manager Zoe Oakley completed this project and what a great job she did. It was a full refurbishment project, including shopfront, ceilings, floors, walls, signage, back of house and furnishings. These photos demonstrate just how great the finished store looks.
DGCL won the tender for the roofing works at Foundry Lane Primary School in Southampton. The works consisted of putting up scaffolding around the school, striping off the existing roof and replacing the tiles and guttering. Internal ceiling reinstatement works were also completed as part of the project. The project was completed ensuring that upon […]
DGCL won the tender for the office refurbishment works of a floor in the Eldon Building for Portsmouth University. The site is located in the centre of Portsmouth. The works consisted of the strip out and demolition of the existing offices and the reinstatement of a number of new offices and partition walls and a […]
Midleton Industrial Estate, Guildford Contract Duration: Contact start, Sept 23rd 2019 with PC taking place July 23rd 2020. 9 months. PC originally scheduled to take place April 24th 2020 (but following the UK government imposed lockdown in March 2020 due to the Covid-19 global pandemic, there was a forced slowdown of programmed works, resulting in […]
Dartmouth General Contractors Limited have worked on 5 of the Co-op distribution centres. The works on these sites have ranged from drainage works to compliance works, white lining, crash barriers, cold store extensions and dock bay leveller works.
We completed over 21 weeks. This project involved installing an energy saving system to existing car park. Energy used in store is recycled back resulting in massive cost saving and energy efficiency. Works included Removal existing car par surface. Bore field 19 x 150m bore holes. Installation of the main manifold chamber. Produce the […]
We completed over 4 weeks. (2 weeks asbestos removal 2 refurbishment). This project involved closing the store, removing asbestos from shop floor ceiling, installing new ceiling grid, lighting, security along with a new shelving configuration, chilled cases, decoration and new branding to store. Works included Remove ALL asbestos. Strip the internal back to brick walls […]
Dartmouth General Contractors Limited were appointed the main contractors for the new build of the Sports Pavillion for Guildford College. This was a project that involved the new build of accommodation in terms of new changing facilities for the sports for Guildford College and to provide a bar. The client was delighted with the works […]