Dartmouth General Contractors Limited have worked on 5 of the Co-op distribution centres. The works on these sites have ranged from drainage works to compliance works, white lining, crash barriers, cold store extensions and dock bay leveller works.

Sainsbury’s Ground Source Retrieval System

/ / /
We completed over 21 weeks. This project involved installing an energy saving system to existing car park.   Energy used in store is recycled back resulting in massive cost saving and energy efficiency.  Works included Removal existing car par surface. Bore field 19 x 150m bore holes. Installation of the main manifold chamber. Produce the […]

Sainsbury’s Asbestos Removal & Refurbishment

/ / / /
We completed over 4 weeks. (2 weeks asbestos removal 2 refurbishment). This project involved closing the store, removing asbestos from shop floor ceiling, installing new ceiling grid, lighting, security along with a new shelving configuration, chilled cases, decoration and new branding to store. Works included Remove ALL asbestos. Strip the internal back to brick walls […]

Guildford College

/ / / / / /
Dartmouth General Contractors Limited were appointed the main contractors for the new build of the Sports Pavillion for Guildford College. This was a project that involved the new build of accommodation in terms of new changing facilities for the sports for Guildford College and to provide a bar. The client was delighted with the works […]

Lark Hill School

/ / / / /
As an educational project it was imperative that our teams were all DBS checked for the works completed at Lark Hill School. Dartmouth General Contractors Limited, completed various works inside the school and the refurbishment of the playground which included the completion of the new Flower beds in the School grounds. This was a fantastic […]

Carter Synergy

/ / / / / / / /
Dartmouth General Contractors Limited have worked with Carter Synergy on many projects over the years and continue a strong relationship today. Working with them through various store refurbishments and fit outs within the food retail industry, DGCL now work with Carter Synergy as a main contractor on their Refrigeration Replacement Scheme or whenever Carter Synergy […]

Ryan-Jayberg Ltd

/ / / / / / / / /
Dartmouth General Contractors Limited have been working with Ryan Jayberg for a number of years. Not only have they worked with us in terms of supply in the past but we also now in work in partnership, where Dartmouth General Contractors now complete many main contractors works for Ryan Jayberg’s clients.

Ikea

/ / / / / /
The fun of working at Ikea is that our teams get to build their flat pack furniture, which most of them agree, due to their great instructions and easy packing make the projects all that more enjoyable. Our team completed numerous sets within the Ikea stores at Brent Park and in Southampton. This included the […]

Santander Maintenance

/ / / / / /
Dartmouth General Contractors Limited have a small works department that have been working with ISS World to complete a large spread of works for Santander.  This has included roof works and internal works such as carpet replacement, roof tile replacements and general maintenance tasks.

Hotels

/ / / / /
Dartmouth General Contractors Limited has worked in several hotels including works for Solent Hotels, Travel Lodge and Swallow Hotels. The range of works amongst these groups includes a range of services from new build to small works and maintenance, proving that Dartmouth General Contractors Ltd really can adapt to their clients needs, whatever the project.